Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Dik Mazular
Country: Madagascar
Language: English (Spanish)
Genre: Love
Published (Last): 7 December 2017
Pages: 175
PDF File Size: 15.83 Mb
ePub File Size: 9.19 Mb
ISBN: 131-2-12060-422-5
Downloads: 12140
Price: Free* [*Free Regsitration Required]
Uploader: Maurr

Substation installation requirements The substation must be sheltered from flooding and any infiltrations. Compliance with this indication is compulsory, non compliance with this stipulation may damage the equipment.

FLUOKIT M24+ – Schneider Electric

They are routed along a cable trough or trench or through floor openings. Pouring the cement top coat. These floukit carried out by Schneider Electric or by a specialised technician, trained by Schneider Electric in the implementation of procedures, and who is equipped with specific equipment.

Levelling fljokit profile sections. In this case a mounting base is added to the lower part of each Functional Unit in order to facilitate the penetration of the cable and respect the bend radius necessary for its connection.

Definition of the substations. Work on the Civil Engineering structure. The average water vapour pressure over a period of 24 hours must not exceed 22 mbar. It offers optimum and flexible switchboard configuration for every electrical scheme with the highest safety. The height of the top coat must arrive between flluokit and 2mm below the height of the irons. They must be equipped with all the correct protective equipment required for the task being performed. Preventive maintenance of the circuit breaker part Please refer to specific instructions See page 4.

The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational. No ducts of any kind k24 pass through the substation’s immediate environment without special protection sheaths or ducts. Geometry of the cable trough.

Related Posts  TIP42C PDF

Schneider Electric, dluokit Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. The length of the cable is calculated as a function of the altitude [A] of the connecting point.

The delimitation of the civil engineering layout depends on the type and quantity of materials to be installed refer to the following chapters. The dressing of a top coat of cement using a rule should eliminate any surface irregularities greater than 2 mm per metre.

Preparation of the sections. The irons also serve in levelling the cement topcoat. The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions.

This condensation can be avoided by an appropriate lay-out of the room or of the building suitably adapted ventilation, air driers, heating etc. Its thickness must be about 70mm of cement dosed at kg of CPA.

Cable troughs and ducts must be blocked up to avoid: Secondary Air Insulated Switchgear. Installing the Functional Units to the floor. Switchboard back-to-back against a wall or not, with internal arc withstand. Reserve opening for connecting the earthing cable. The safety alert symbol shall not be used with this signal word. It can be used in a wide range of application fields such as utilities, wind parks, industry, buildings, infrastructure and consumer substations.

ECOFIT Fluokit M24/FP

Smooth finish top coat Un-surfaced exposed concrete 9. Make up a frame composed of two profile sections, laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard.

Respect the imposed distances see chapter 5. Layout on a type 2 cable trough, with width of more than 50cm Whenever the width of the cable trough exceeds 50 cm, it is necessary to fit the longitudinal support irons to support the left and right-hand uprights for each Functional Unit.

Installation of the switchboard. Our products are fully quality controlled and tested at the factory in accordance with the standards and regulations currently in force. Case of a type 2 cable fluokot.

Related Posts  LITURGIA GODZIN PDF

FLUOKIT M+ 24kV

Local requirements especially about safety and which are in accordance with the indications given in this document, must be observed. Local safety requirements which are in accordance with these instructions, especially those regarding the safety of product operators and other site workers, must be observed. Generally this depth [P] is equal to generally higher than the bend radius of the cables [R].

Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. If this is not the case, please refer to our Service Unit or Training Centre. Passages must be designed to permit easy maintenance for all of the substation’s elements circuit breaker, transformer, etc.

Pouring the cement top coat Block off the irons to avoid penetration of cement into the rail. Position and adjust the rails in height by acting on the adjusting nuts. The correct functioning and lifespan of the product depend on respecting the installation, commissioning and exploitation instructions found in this manual.

Access to the substation Substation access must remain free at all times and under any circumstances. Other technical notices to be consulted. Layout of the Functional Units.

This document has been printed on ecological paper Publishing: These openings are to be calculated and carried out at the same time as the installation of the equipment to the floor. Do not do it! Reserve opening at the extremity of each rail.

Do not place Functional Units below any ventilation grilles, air vents, or air conditioning grilles or in the immediate proximity of glass tile panels in direct contact with the outside.