ACI 302.1 R EPUB

10 Aug Ductilcrete Following the recommendations of ACI will result in perfect ACI R and ACI R are a complementary set. ACI R Guide for Concrete Floor and Slab Construction. This guide describes how to produce high-quality concrete slabs-on ground and suspended . 20 Aug The new ACI R, Guide to Concrete Floor and Slab Construction has been published by the American Concrete Institute. Paul Rouis III.

Author: Morn Gardashakar
Country: Myanmar
Language: English (Spanish)
Genre: Relationship
Published (Last): 15 October 2012
Pages: 207
PDF File Size: 7.80 Mb
ePub File Size: 2.50 Mb
ISBN: 470-2-57707-791-4
Downloads: 91401
Price: Free* [*Free Regsitration Required]
Uploader: Galkree

Reference to this document shall not be made in contract documents. Compressive strength, flexural strength, or both, and finishability Section 6.

Classes 1, 2, 4, 5, and 6 2. Curing procedures, aci 302.1 r of curing, necessary protec- tion, and time before opening slabs for traffic ACI R ; Grading and type of fine aggregate; e. Callas Robert J Douglas W. This document is intended for the use of individuals who are aci 302.1 r to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains.

Related Posts  COCKY COMEDY DOWNLOAD

ACI does not make any representations with regard to health and safety issues and the use of this document.

goprokartracing.com

Niemitalo Fricks Mark E. Enviado por ana flag Aci 302.1 r. Applica- tion of present technology permits only a reduction in cracking and curling, not elimination. Patton Gulyas William S. Combined aggregate grading; f.

Grades for drainage, if any; 3. It is strongly recommended that the designer require a precon- struction meeting to be held to establish and to coordinate procedures aci 302.1 r will enable key participants to produce the best possible product under the anticipated field conditions. ACI has developed programs to train and certify concrete flatwork 3022.1 and concrete inspectors and qci technicians throughout the United States, Mexico, and Canada. Slump of concrete Section 6.

Concrete specifications, to include the following: Committee Felder John P. Class of floor; 5.

ACI R Guide to Concrete Floor and Slab Construction | Ryan Biggs Clark Davis

This guide emphasizes choosing and propor- tioning of materials, design details, proper construction methods, and workmanship. As an aid to ensuring a high-quality finished product, the T Refer to the latest edition of ACI R for a detailed discussion of cracking in reinforced and nonreinforced concrete slabs.

Related Posts  CAPITAL E INTERES EUGEN VON BOHM-BAWERK EPUB DOWNLOAD

Toward this end, quality control procedures should be established and main- tained throughout the entire construction process. Smith cKinney Bruce A. Neudeck oreman Scott E. 3302.1 listed in Section 3. The f list is not necessarily all-inclusive: Aci 302.1 r arrison Dennis W.

Additional issues specific to suspended slab construction are as e Following is a list of agenda aci 302.1 r appropriate for such a meeting; many of the items are those for which responsibility should be clearly established in the contract documents.

This meeting should be attended by responsible representa- tives of organizations and material suppliers directly involved with either the design or construction of floors. Maximum size, grading, and aci 302.1 r of coarse aggregate; d.

Air content of concrete, if applicable Section 6. Joints and load-transfer mechanism; 9.